6.1.1. PUMPED INSTRUMENTS - REGULATOR SELECTION
If the monitor has a pump enabled, the user is asked if the pump will be used during the bump test,
as illustrated in
Figure 6-3: Regulator Valve
•
YES – use a demand or balanced flow regulator, press the R button.
•
NO – use a direct flow regulator, press the L button.
6.2. Applying Test Gas
Apply the test gas to the monitor via the direct flow regulator set to 0.5 l/min, as shown in
Figure 6-4: Bump Test
6-2
Figure 6-2: Apply Gas Screen (4-Gas Model)
Choice.
Figure 6-3: Regulator Valve Choice
Kit.
PORTABLE GAS MONITOR
MANUAL BUMP TEST OPTIONS
64171, Rev. 11/December 2019
PS200