Installing Expansion Blades In The 19" Chassis (Optional) - NEC Univerge SV8100 System Hardware Manual

Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

UNIVERGE SV8100
System Hardware Manual
3.3.2

Installing Expansion Blades in the 19" Chassis (Optional)

When adding additional chassis to the system to expand the
capacity, a PZ-BS10 must be installed in the Controlling Chassis and
a PZ-BS11 must be installed in all Expansion Chassis. This
connection is required with any multiple-chassis setup.
The PZ-BS10 connects the Controlling Chassis to the Expansion
Chassis by connecting to a PZ-BS11, which is installed on each
Expansion Chassis. These Expansion Interface Units allow the CPU
to transmit/receive data as required to the additional chassis.
The PZ-BS10 is installed in the Expansion bay Controlling Chassis
which is equipped with a CPU blade. The PZ-BS11 is installed in the
Expansion bay of the Expansion Chassis, which does not have a
CPU.
The Expansion cable connects the Controlling Chassis and its
PZ-BS10 interface to the second, third, and fourth PZ-BS11
interface.
Use only the CAT 5 cables provided by NEC to make the
connections between the Controlling and Expansion Chassis.
The PZ-BS10 provides:
Communication Processor Interface for data handling through
Communication Channel (24 slots maximum)
64 Channels for Telephony Resource (e.g., DTMF Tone
Receiver, Call Progress Tone Detector, MFC Tone Receiver,
Caller ID Receiver, Caller ID Signal Sender)
DSP Resource Management
Issue 2.0
3 - 9

Advertisement

Table of Contents
loading

Table of Contents