Solid Wall Or Stud Partition (Using Rear Fixing Points On Shower Control) - Mira Discovery Installation And User Manual

Shower valve
Table of Contents

Advertisement

2. Solid Wall or Stud Partition
(Using Rear Fixing Points on Shower Control)
2.1 Refer to section: '1. Solid Wall or
Stud Partition (Using Securing
Brackets - Mounting off Front Face)'
and follow steps 1.1 to 1.4.
2.2 Cut away the plasterboard or brick
work to the required depth.
Important! This depth 'X' will depend
on the finished wall thickness
e.g. tiles or facia board. Refer to the
table for this measurement.
For stud partitions depth 'X' refers to
the distance from the rear mounting
e.g. timber noggin, to the front of the
wall (before tiling).
Finished Wall Thickness
(e.g. tile and adhesive)
For latest prices and delivery to your door visit MyTub Ltd - www.mytub.co.uk - info@mytub.co.uk 0844 556 1818
Rear Support
4 mm
6 mm
8 mm
10 mm
12 mm
14 mm
16 mm
18 mm
20 mm
22 mm
24 mm
20
Depth 'X'
Wall Cutout Depth 'X'
81 - 63 mm
79 - 61 mm
77 - 59 mm
75 - 57 mm
73 - 55 mm
71 - 55 mm
69 - 55 mm
67 - 55 mm
65 - 55 mm
63 - 55 mm
61 - 55 mm
Finished Wall
Surface
Finished Wall
Thickness

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents