Priming The Meter - CONCORD 2800 Operator's Manual

Air systems
Table of Contents

Advertisement

Operate the auger selector valve (1) to send
12.
hydraulic oil to the fan/meter circuit.
Close the blower ball-valve.
13.
Engage the tractor hydraulic remote
14.
controlling the blower circuit.
Make sure the blower does not rotate. If the
blower rotates, close the blower ball-valve.
Open the cleanout door below the meter to
15.
be calibrated.

Priming the Meter

The electronic control unit (ECU) has a touch
pad (1) that will be used for calibration.
Before starting the procedure:
Enter the Rate Sensor Setup Screen (1) found in the
System settings menu.
From the table on previous page enter a Calibration
Rate based metering wheel, width of machine, and
rate desired for each (PR) Product (1).
This calibration value is a starting point at which
you will need to start the calibration procedure.
If the product density is known, enter it for the
desired product.
Do not Change the Product Density After
Calibrating - The calibration number will change
Be sure that the Master Apply switch is on and
green.
Fig. 21
Fig. 22
Fig. 23
3. Operation
68

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

335038005250

Table of Contents