Preparation; Unpacking The Machine; Equipment Preparation - Wega Wegaconcept Use And Maintenance Manual

Table of Contents

Advertisement

2

Preparation

2.1

Unpacking the machine

Open the packaging, ensuring not to damage the
machine.
Remove the machine protections and the equipment
contained in the package. Take the machine out.
If there is an external motor pump, the motor and the
pump are provided in a separate package.
Screw the steam nozzles to
the taps.
2.2

Equipment preparation

Filter holder
In the housing of the filter holder (1), place the spring
to stop the filter (2).
Take the two cups (3) or one-cup (4) filter and press
it firmly into the filter holder.
Spouts
Complete the filter holder by installing the two-cup
(6) or one-cup (5) spout.
3
2
1
6
5
Technical manual
!
Install the spout with relative filter: one-cup spout
on one-cup filter holder or with one-cup filter, etc...
Motor pump
For the machines with an external motor, it is
necessary to prepare the pump and the motor.
Assemble the 3/8 gas connection with the inlet filter
(2) of the pump (arrow
connection (1) of the pump (arrow
Use the special washers (3) provided for sealing
purposes.
To correctly couple the pump and motor, use the
appropriate joint (4) and the spacer ring (5), lock
everything with the two clamps (6).
The pump and motor joint has to be installed also on
the machines with an internal motor pump.
!
Install the connection with the inlet filter (2) of the
pump (arrow
4
Softener
The softener is supplied by default.
On request, an automatic resin
softener is supplied.
For further information, refer to
chapter 15 "Softeners".
Wegaconcept
) and the plain 3/8 outlet gas
).
1
3
6
5
4
6
).
2
3
11