Preparation; Unpacking The Machine - Wega Mininova Use And Maintenance Manual For The Technician

Hide thumbs Also See for Mininova:
Table of Contents

Advertisement

2
2
5
i
All technical data are indicated on the technical
data plate.
The detais of the equipment are also reported on
the label located on the packaging of the machine.
Technical manual
Q
technical
data
plate
2

Preparation

2.1

Unpacking the machine

Open the packaging, ensuring not to damage the
machine.
Remove the machine protections and the equipment
contained in the package. Take the machine out.
If there is an external motor pump, the motor and the
pump are provided in a separate package.
!
Handling operations must be performed by at
least 2 persons or with the aid of suitable lifting
accessories.
!
Considering the significant weight of the
equipment, use extreme caution in handling and
use safety gloves.
ROSSO
C:0 M:100 Y:100 K:0
NERO
C:0 M:0 Y:0 K:100
VERDE
C:100 M:0 Y:100 K:0
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents