Preparation of the machine

The preparation of the machine and the install-
ation operations must be carried out by qualified
personnel only.
The installer must strictly follow the indications
provided in chapter 5 "Warnings for the Installer".
6.1

Filling the water tank

• Turn the key and open the door (A);
• fill the tank (B) with cold drinkable water;
• close the door and
lock it.
6.2

Tank filter

If the water hardness
is more than 5°f , a BRITA
filter (supplied by de-
fault) should be installed
on the tank. Not only
does this filter reduce
limescale build-up, but
it also eliminates any
impurities and other substances such as chlorine
in the water.
Install the filter at the bottom of the tank accord-
ing to the manufacturer's instructions.
It is recommended to change the filter regularly,
!
depending on water consumption as per
machine warning, and no later than four months
since last replacement.
Refer to chapter 11 for warning and filter
replacement.
!
It is recommended that you use potable water
and avoid using other liquids.
!
Using the machine without all the installation
operations having been carried out by technical
personnel could damage it seriously.
!
The machine must be placed in a perfectly
horizontal position.
instructions for the user
A
B
7

Machine start-up

7.1

Turning the machine on

• Connect the machine to the power supply by
pugging the power cord;
• Turn the switch ON (9);
• the automatic filling of water in the boiler and
the dispenser unit heating are activated when
the machine is switched on;
• when the filling of water in the boiler has finished
the services boiler heating phase starts, indicated
by the sequential flashing of the LEDs of the keys;
• wait for the coffee machine to warm up com-
pletely, indicated by the lighting of the LEDs (5).
The flashing boiler level LED (10) indicates:
- LED flashing slowly: boiler filling in
progress;
- LED on: proper boiler level;
- LED flashing fast: boiler filling time out
(time limit for the filling exceeded).
When the machine is ready for dispensing, all the
LEDs are steady-on.
Turn on the machine 15 minutes before use to
ensure optimum performance during operation!
5
9
10
33

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents