Preparation; Unpacking The Machine; Equipment Preparation - Wega Concept Use And Maintenance Manual

Table of Contents

Advertisement

2

Preparation

2.1

Unpacking the machine

Open the packaging, ensuring not to damage the
machine.
Remove the machine protections and the equipment
contained in the package. Take the machine out.
If there is an external motor pump, the motor and the
pump are provided in a separate package.
Screw the steam nozzles to
the taps.
2.2

Equipment preparation

Filter holder
In the housing of the fi lter holder(1), place the spring
to stop the fi lter (2).
Take the two cups (3) or one-cup (4) fi lter and press
it fi rmly into the fi lter holder.
Spouts
Complete the fi lter holder by installing the two-cup
(6) or one-cup (5) spout.
3
2
1
6
5
Technical manual
!
Install the spout with related fi lter: one-cup spout
on one-cup fi lter fi lter holder, etc.
Motor pump
For the machines with an external motor, it is
necessary to prepare the pump and the motor.
Assemble the 3/8 gas connection with the inlet fi lter
(2) of the pump (arrow  ) and the plain 3/8 outlet gas
connection (1) of the pump (arrow ).
Use the special washers (3) provided for sealing
purposes.
To correctly couple the pump and motor, use the
appropriate joint (4) and the spacer ring (5), lock
everything with the two clamps (6).
The pump and motor joint has to be installed also on
the machines with an internal motor pump.
!
Install the connection with the inlet fi lter (2) of the
pump (arrow  ).
4
Softener
The softener is supplied by
default.
On request, an automatic resin
softener is supplied.
For further information, refer to
the chapter "12 Softener".
Wegaconcept
1
3
6
5
4
6
2
3
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents