Commissioning; Procedure When Commissioning - Siemens SINAMICS S120 Commissioning Manual

Hide thumbs Also See for SINAMICS S120:
Table of Contents

Advertisement

Commissioning

2.1

Procedure when commissioning

Once the basic requirements have been met, commissioning can proceed in the following
steps:
Table 2- 1
Note
If motors with a DRIVE-CLiQ interface are used, when the Sensor Module is replaced at the
motor, all motor and encoder data should be saved in a non-volatile manner by setting
parameter p4692 = 1.
Commissioning Manual
Commissioning Manual, (IH1), 01/2011, 6SL3097-4AF00-0BP1
Commissioning
Step
1
Create project with STARTER.
2
Configure the drive unit in STARTER.
3
Save the project in STARTER.
4
Go online with the target device in STARTER.
5
Load the project to the target device.
6
The motor starts to run.
Activity
2
51