First Commissioning, Vector Control Mode In The Chassis Format - Siemens SINAMICS S120 Commissioning Manual

Hide thumbs Also See for SINAMICS S120:
Table of Contents

Advertisement

Commissioning

2.7 First commissioning, vector control mode in the chassis format

STARTER diagnosis options
Under "Component" -> Diagnosis -> Control/status words
● Control/status words
● Status parameters
● Missing enable signals
2.7
First commissioning, vector control mode in the chassis format
The example provided in this section explains all the configuration and parameter settings,
as well as the tests that are required for initial commissioning. Commissioning is carried out
using the STARTER commissioning tool.
Requirements for commissioning
1. The commissioning requirements have been met according to Section 1.1.
2. The check list - Table 1-1 or 1-2 from the Chapter Preparing for commissioning - has
3. The STARTER commissioning tool is installed and activated.
4. The power supply (24 V DC) is switched on.
96
been filled out and the points complied with.
--> see the "Readme" file on the STARTER installation CD.
Commissioning Manual, (IH1), 01/2011, 6SL3097-4AF00-0BP1
Commissioning Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents