Siemens SIMATIC MV500 Operating Manual page 28

Optical identification
Hide thumbs Also See for SIMATIC MV500:
Table of Contents

Advertisement

Application
5.1 Program
Optimization
Note field
Figure 5-2
The symbols that appear in the auto-setup status display are described below.
Table 5- 7
Icon
Structure analysis
graph
Quality graph
28
In this column, you can see the step currently being run during the optimization
phase of the adaptation. Once automatic adaptation is completed, you can check
the optimizations that have been made to the focus and exposure for the code
type found.
The quality graph displays the read qualities ("Overall quality") from the optimiza-
tion phase. Move the mouse over the individual points of the graph to check which
quality results were achieved in the optimization phase with which filter.
Once automatic adaptation is completed, detailed information and further instruc-
tions on the achieved adaptation result are displayed in the note field.
Sample status display of an auto-setup
Symbols of the status display and graphs
Description
Indicates that this phase is in progress.
Indicates that this phase is still waiting to run.
Indicates that this phase has been disabled and will not be run.
Indicates that this phase has been successfully completed ("OK").
Indicates that this phase has not been successfully completed ("NOK").
Indicates that this phase was aborted with an error.
Detailed information about the sharpness symbols
3-segment circle: One or more segments of the internal ring light were used.
Blue: The main beam segment was switched on.
Red: The unpolarized light segment was on.
Yellow: The polarized light segment was on.
White circle: An external lamp was used.
Black circle: No lamp was used.
Detailed information on the read quality ("Overall quality"):
Green: Good
Yellow: Sufficient
Red: Bad
:
Operating Manual, 05/2019, C79000-G8976-C495-02
SIMATIC MV500

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents