B. Preliminary Equipment Check
IS THERE ANY SHIPPING DAMAGE? ____________________________
_________________________________________________________________________________________________________
WILL THIS DAMAGE PREVENT UNIT START-UP?________________________________

UNIT IS LEVEL IN ITS INSTALLATION

UNIT IS SUPPLIED WITH THE PROPER CONTROL VOLTAGE _________________VAC

ELECTRICAL CIRCUIT WIRING HAS BEEN SIZED AND INSTALLED PROPERLY

UNIT GROUND WIRE HAS BEEN CONNECTED

ELECTRICAL CIRCUIT PROTECTION HAS BEEN SIZED AND INSTALLED PROPERLY

ALL TERMINALS ARE TIGHT

ALL CABLES AND THERMISTORS HAVE BEEN INSPECTED FOR CROSSED WIRES

ALL PLUG ASSEMBLIES ARE TIGHT
CHECK CHILLED WATER SYSTEM

ALL CHILLED WATER VALVES ARE OPEN

ALL FLUID PIPING IS CONNECTED PROPERLY

ALL AIR HAS BEEN VENTED FROM THE SYSTEM

CHILLED WATER PUMP (CWP) IS OPERATING WITH THE CORRECT ROTATION
CWP AMPERAGE:
PUMP PRESSURES: INLET:____________________________
CHECK CONDENSER SYSTEM (30HXC ONLY):

ALL CONDENSER WATER VALVES ARE OPEN

ALL CONDENSER PIPING IS CONNECTED PROPERLY

ALL AIR HAS BEEN VENTED FROM THE SYSTEM

CONDENSER WATER PUMP IS OPERATING WITH THE CORRECT ROTATION
CONDENSER WATER PUMP AMP: RATED: ______________
PUMP PRESSURES:
CHECK REMOTE CONDENSER SYSTEM (30HXA ONLY):

ALL REFRIGERANT PIPING IS CONNECTED PROPERLY

CHILLER REFRIGERANT PIPING AND CONDENSER HAS BEEN EVACUATED, AS REQUIRED
RATED: ___________________________
INLET: _______________
IF SO, WHERE ___________________________
ACTUAL:____________________________________
OUTLET: ____________________________________
ACTUAL:____________________________________
OUTLET: ____________________________________
CL-2