Patch Cord Installation And Administration - AT&T 75 Wiring Manual

Hide thumbs Also See for 75:
Table of Contents

Advertisement

110-TYPE HARDWARE

PATCH CORD INSTALLATION AND ADMINISTRATION

Before starting the patch cord installation, obtain a copy of the Port Assignment Record
forms (Figure 3-91) from the customer or marketing representative. These forms contain
the port assignments and identify the extension numbers (Terminal No.) for the voice
terminals. You must enter the jack assignments at the equipment room and indicate if
adjunct power is required and where provided (cross-connect field, site closet, satellite closet,
or information outlet).
When satellite locations are provided, enter the satellite letter designation (A through F)
and the jack appearance in the equipment room on the form. Also enter the floor
designation and/or building designation if appropriate. For 1-point administration (see
Figure 3-92), this entry is all that is required. The white field number always corresponds to
the station jack number at the satellite location blue field.
For 2-point administration (see Figure 3-93), the station jack numbers (blue field) at the
satellite locations must also be entered on the form. For example, the entry A 1 - 1 0
indicates satellite location A, white field position 1 at the equipment room and the satellite
location, and station jack number 10 at the satellite location.
3-122

Advertisement

Table of Contents
loading

This manual is also suitable for:

75 xe

Table of Contents