AT&T 75 Wiring Manual page 421

Hide thumbs Also See for 75:
Table of Contents

Advertisement

Block Diagram of System 75 or System 75 Reinstallation
Figure 4-1
Figure 4-2
66M1-50 Connecting Block
157B Connecting Block
Figure 4-3
183A-Type Backboard
Figure 4-4
187B1 Backboard
Figure 4-5
Power Adapter Cord
Figure 4-6
Figure 4-7
Cable Slack Managers
Model 575-4 Sneak Fuse Panel
Figure 4-8
Trunk Concentrator Cables (WP-90929, Lists 2 and 4, Cable
Figure 4-9
Assemblies)
Individual Power Supplies
Figure 4-10
AC Power Strip
Figure 4-11
346 Modular Bulk Power Supply
Figure 4-12
Figure 4-13
346A1 Power Panel Circuit Breaker Locations
Typical Cross-Connect Field Arrangement Using 66-Type
Figure 4-14
Hardware
Typical Cross-Connect Field Installation using 66-Type Connecting
Figure 4-15
Blocks
Typical 2-Carrier Cabinet System 75 or 2-Cabinet System 75 XE Floor
Figure 4-16
Plan
Figure 4-17
Typical 5-Carrier Cabinet System 75 or 3- or 4-Cabinet System 75 XE
Floor Plan
Cross-Connect Field Installation
Figure 4-18
Labeling 66-Type Connecting Blocks
Figure 4-19
Equipment Room Cabling Labels
Figure 4-20
Figure 4-21
Self-Stick Label Installation on 25-Pair Cable Connector
Cable Routing Through Cable Slack Manager—1-Cabinet Installation
Figure 4-22
(Using Cable Routing From The Bottom)
Cable Routing Through Cable Slack Manager—1-Cabinet Installation
Figure 4-23
(Using Cable Routing From The Top)
Cable Routing From Switch Cabinet to Cross-Connect Field (Using
Figure 4-24
Cable Routing From The Bottom)
Cable Routing From Switch Cabinet to Cross-Connect Field (Using
Figure 4-25
Cable Routing From The Top)
Typical Port Cable Installation at Switch Cabinet
Figure 4-26
LIST OF FIGURES
- v i -
4-1
4-3
4-7
4-8
4-9
4-10
4-13
4-15
4-17
4-20
4-21
4-23
4-24
4-27
4-29
4-30
4-31
4-35
4-37
4-42
4-43
4-44
4-45
4-46
4-47
4-48

Advertisement

Table of Contents
loading

This manual is also suitable for:

75 xe

Table of Contents