AT&T 75 Wiring Manual page 22

Hide thumbs Also See for 75:
Table of Contents

Advertisement

Figure 2-28
Cross-Connect Field Layout
Port Labels
Figure 2-29
Figure 2-30
4-Pair Station Appearance Labels
Figure 2-31
3-Pair Station Appearance Labels
Auxiliary Labels
Figure 2-32
Figure 2-33
Section TIE Labels
Figure 2-34
Clear Plastic Label Holder (188UT1-50 Strip Designation)
Figure 2-35
Control Carrier Outputs (AUXILIARY Label)
Figure 2-36
System Port Circuit Appearances and Trunk Labels
Figure 2-37
System Port Circuit Appearances and Auxiliary Circuit
Labels
Z1A Emergency Transfer Unit Labels
Figure 2-38
Figure 2-39
574-5 Power Transfer Unit Labels
"X" Connector Label
Figure 2-40
Equipment Room Cabling Labels
Figure 2-41
Figure 2-42
Self-Stick Label Installation on 25-Pair Cable Connector
Figure 2-43
Cable Routing Through Cable Slack Manager—1-Cabinet
Installation
Figure 2-44
Cable Routing From Switch Cabinet to Cross-Connect Field and Cable
Access Panel
Figure 2-45
Typical Port Cable Installation at Switch Cabinet
Figure 2-46
Control Carrier Outputs (AUXILIARY Connector)—System
75
Figure 2-47
Control Carrier Outputs (AUXILIARY Connector)—System 75
X E
Figure 2-48
System 75 2-Carrier Slot Addresses
Figure 2-49
System 75 5-Carrier Slot Addresses
Figure 2-50
System 75 XE Carrier Slot Addresses
Installing Concentrator Cables Between the CAP and the Switch
Figure 2-51
Cabinet
Figure 2-52
Coupled Bonded Conductor Grounding Installation
Figure 2-53
Connector Module Flex Tab Latch Locations
25-Pair Cable Routing Through Connector Module
Figure 2-54
Figure 2-55
4-Pair Single Modular Plug-Ended Station Cable
Figure 2-56
Example of Extending 4-Pair Station Cables
258A and BR2580A Adapters
Figure 2-57
Figure 2-58
356A Adapter
- v i i -
2-42
2-43
2-44
2-45
2-46
2-47
2-51
2-53
2-55
2-56
2-58
2-59
2-60
2-61
2-61
2-62
2-63
2-64
2-65
2-66
2-69
2-70
2-71
2-72
2-74
2-76
2-77
2-79
2-80
2-81
2-82

Advertisement

Table of Contents
loading

This manual is also suitable for:

75 xe

Table of Contents