INTERNAL BATTERY INSTALLATION
Installing the Internal Batteries
36
Eaton 9355-F47 Unirom UPS (10/15 kVA) User's Guide
Lethal voltage will be present when performing the steps in this section.
To install the internal batteries:
1. Verify that the input, output, and battery circuit breakers are in the
OFF position (see Figure 16).
2. Verify that the input and output battery circuit breakers have
appropriate lockout/tagout devices installed.
D A N G E R
Figure 16. UPS Rear View
S
164201642 Rev C www.eaton.com/powerquality
UPS Battery
Circuit Breaker
Input and Output
Circuit Breakers