Roll Feeder Installation Procedure - Ricoh Neptune-P1 Service Manual

Table of Contents

Advertisement

1. Installation
1

Roll Feeder Installation Procedure

Setting the Main Machine on the Roll Feeder
1. Do not remove the shipping tape from the connectors [1] of the roll feeder [2]. This prevents damage
to the connectors when the main machine is put on top of the roll feeder.
• The main machine weighs 100 kg (220 lb.).
• There are two handles in recesses on each side of the main machine. To prevent injury or damage
to the main machine, always use these handles [3] to lift the main machine.
44

Advertisement

Table of Contents
loading

Table of Contents