Roof Termination Cap Installation With And Without; Optional Mechanical Damper - Heat & Glo FDN-5-PIER Installation And Operating Manual

Co-linear direct vent gas fireplaces, natural gas
Table of Contents

Advertisement

G. ROOF TERMINATION CAP INSTALLATION - WITH AND WITHOUT DAMPER
Roof Termination Without

Optional Mechanical Damper

Figure 8G.1
Roof Termination With
Optional Mechanical Damper
OPTIONAL
Figure 8G.2
Heat & Glo • FDN-4-PIER, FDN-5-PIER, FDN-6-PIER, FDN-7-PIER Installation Manual • 16400-9803 • 2/19
8 - VENTING
POWERVENT
MOUNTING BRACKETS
OR DRILL MOUNTING
HOLES TO MATCH BASE
INSULATION PAD
MUST BE CUT IN CENTER TO
ACCOMMODATE VENT SIZE
STEEL CHIMNEY ADAPTER
POWERVENT
MOUNTING BRACKETS
OR DRILL MOUNTING
HOLES TO MATCH BASE
INSULATION PAD
MUST BE CUT IN CENTER TO
ACCOMMODATE VENT SIZE
MECHANICAL
FLUE DAMPER
23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Foundation pier seriesFdn-6-pierFdn-4-pierFdn-7-pier

Table of Contents