Vertical Termination Vent Cap Location & Clearances - Heat & Glo FDN-5-PIER Installation And Operating Manual

Co-linear direct vent gas fireplaces, natural gas
Table of Contents

Advertisement

F. VERTICAL TERMINATION VENT CAP LOCATION AND CLEARANCES
ROOF PITCH
FLAT TO 6/12
OVER 6/12 TO 7/12
OVER 7/12 TO 8/12
OVER 8/12 TO 9/12
OVER 9/12 TO 10/12
OVER 10/12 TO 11/12
OVER 11/12 TO 12/12
OVER 12/12 TO 14/12
OVER 14/12 TO 16/12
OVER 16/12 TO 18/12
OVER 18/12 TO 20/12
OVER 20/12 TO 21/12
Figure 8F
Heat & Glo • FDN-4-PIER, FDN-5-PIER, FDN-6-PIER, FDN-7-PIER Installation Manual • 16400-9803 • 2/19
22
8 - VENTING
H (Min.) Ft.
1.0*
1.25*
1.5*
2.0*
2.5*
3.25
4.0
5.0
6.0
7.0
7.5
8.0
24" MIN
(610MM)
H
24" MIN*
(610MM)
H (Min.) M
0.30
0.38
0.46
0.61
0.76
0.99
1.22
1.52
1.83
2.13
* = 3 foot minimum in
2.27
2.44
* = 24" TO A COMBUSTIBLE SIDE WALL
12" TO A NON-COMBUSTIBLE SIDE WALL
IMPORTANT: ALL DIMENSIONS ARE FROM THE
EDGE OF THE CAP
snowy regions

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Foundation pier seriesFdn-6-pierFdn-4-pierFdn-7-pier

Table of Contents