Horizontal Vent System Clearances; Wall Pass-Through - Heat & Glo FDN-5-PIER Installation And Operating Manual

Co-linear direct vent gas fireplaces, natural gas
Table of Contents

Advertisement

Figure 8.2 Ten Inch B-Vent Collar
SILHOUETTE CIRCLE
Figure 8.3 Silhouette Circle on Intake
B. HORIZONTAL VENT SYSTEM CLEARANCES
ALL APPROVED VENTING
HORIZONTAL
C. WALL PASS-THROUGH - Follow all local codes for requirement of firestops.
Heat & Glo • FDN-4-PIER, FDN-5-PIER, FDN-6-PIER, FDN-7-PIER Installation Manual • 16400-9803 • 2/19
TOP
1 inch (25mm)
Figure 8.4 Base Plate Fastened to Intake
4. An adapter to increase from eight inch pipe to ten
inch pipe is required on the outlet side of the in-line
powervent. The adapter is included in the PVI-67
kit. See Figure 8.5. Connect the adapter directly to
the eight inch outlet collar of the in-line powervent.
Connect the ten inch exhaust B-Vent to the collar and
continue the vent run.
Figure 8.5
BOTTOM
1 inch (25mm)
SCREWS (5 TOTAL)
SIDES
1 inch (25mm)
19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Foundation pier seriesFdn-6-pierFdn-4-pierFdn-7-pier

Table of Contents