C. Installing Roof Flashing and Vertical Ter-
mination Cap
For installation of vertical termination cap see minimum
vent heights for various pitched roofs (see Figure 8.4).
2 FT.
20 INCHES MIN.
MIN.
DISCHARGE
GAS DIRECT VENT
TERMINATION CAP
Roof Pitch
Flat to 6/12....................................... 1.0*
Over 6/12 to 7/12 ........................... 1.25*
Over 7/12 to 8/12 ............................. 1.5*
Over 8/12 to 9/12 ............................. 2.0*
Over 9/12 to 10/12 ............................ 2.5
Over 10/12 to 11/12 ........................ 3.25
Over 11/12 to 12/12 .......................... 4.0
Over 12/12 to 14/12 .......................... 5.0
Over 14/12 to 16/12 .......................... 6.0
Over 16/12 to 18/12 .......................... 7.0
Over 18/12 to 20/12 .......................... 7.5
Over 20/12 to 21/12 .......................... 8.0
* 3 foot minimum in snow regions
Figure 8.4 Minimum Height from Roof to
Lowest Discharge Opening
WARNING
Fire Risk.
Explosion Risk.
Inspect external vent cap regularly.
• Ensure no debris blocks cap.
• Combustible materials blocking cap may
ignite.
• Restricted air fl ow affects burner operation.
22
HORIZONTAL
OVERHANG
VERTICAL
WALL
LOWEST
OPENING
X
12
ROOF PITCH
IS X/ 12
H (MIN.) - MINIMUM HEIGHT FROM ROOF
TO LOWEST DISCHARGE OPENING
H (Min.) Ft.
Heat & Glo • Soho24B • 2137-900 Rev. E • 11/07
Refer to the venting instructions included with your termi-
nation kit for more detailed instructions.
Caulk the gap between the roof fl ashing and the outside
diameter of the pipe. See Figure 8.5. Also caulk the pe-
rimeter of fl ashing that contacts roof surface. The storm
collar is then placed over this joint to make a water tight
seal. See Figure 6. Caulk around the joint between the
storm collar and the vertical pipe.
To attach the vertical termination cap, slide the inner col-
lar of the cap into the inner fl ue of the pipe section and
place the outer collar of the cap over the outer fl ue of the
pipe section.
Secure with three screws into the outer fl ue. Secure the cap
by driving the three self-tapping screws (supplied) through
the pilot holes in the outer collar of the cap into the outer
fl ue of the pipe.
Figure 8.5
STORM
COLLAR
FLASHING
Figure 8.6 Vertical Termination
CAULK
VERT. TERM. CAP
ROOFING NAILS