CAUTION: FIREPLACE IS NOT LOAD-BEARING.
NOTE: OTHER CLEARANCES APPLY. ALL CLEARANCES MUST BE MAINTAINED.
A. STANDOFF INSTALLATION
LOOSEN SCREW
AND FOLD EACH
STANDOFF
STEP 1: Refer to Figure 3A.1
The (4) standoffs will be shipped in a flat state placed on the firebox top.
Locate the standoffs and loosen the screws holding them in place.
STANDOFFS
The Pier fireplace has a
quantity of four (4) standoffs
that are secured with
two (2) screws each (left and
right sides of top).
Figure 3A.3
Placement of the standoffs and nailing flanges on the Pier fireplace.
Heat & Glo • FDN-4-PIER, FDN-5-PIER, FDN-6-PIER, FDN-7-PIER Installation Manual • 16400-9803 • 2/19
3 - PREPARE THE FIREPLACE
REMOVE
SECOND SCREW
Figure 3A.1
Figure 3A.2
PIVOT FOLDED STANDOFF
AND SECURE
STEP 2: Refer to Figure 3A.2
Fold the center of the standoff up and both ends out at the perforated
lines. Using Figure 3A.2 for reference, locate the second pre-installed
screw on the firebox top at each standoff location. Remove the screw,
pivot the folded standoff into location and re-install the screw to secure
the standoff. Tighten up the screw that was loosened in Step 1.
LOOSENED SCREW
Figure 3A.2
NAILING FLANGES
The Pier fireplace has a
quantity of four (4) nailing
flanges that are secured with
two (2) screws each on the
back of the fireplace.