C. Install Roof Flashing and Vertical
Termination Cap
To install roof fl ashing see Figure 8.4.
For installation of vertical termination cap see minimum fl ue
heights for various pitched roofs (see Figure 8.4).
610 mm
610 mm
MIN.
LOWEST
DISCHARGE
OPENING
TERMINATION
CAP
H (MIN.) - MINIMUM HEIGHT FROM ROOF
TO LOWEST DISCHARGE OPENING
Angle
0°-26.6°
........................................................ 0.30*
26.6°-30.3° ........................................................ 0.38*
30.3°-33.7° ........................................................ 0.46*
33.7°-36.9° ........................................................ 0.61*
36.9°-39.8° ........................................................ 0.76
39.8°-42.5° ........................................................ 0.99
42.5°-45.0° ........................................................ 1.22
45.0°-49.4° ........................................................ 1.52
49.4°-53.1° ........................................................ 1.83
53.1°-56.3° ........................................................ 2.13
56.3°-59.0° ........................................................ 2.29
59.0°-60.3° ........................................................ 2.44
*.91 M minimum in snow regions
Figure 8.4 Minimum height from roof to lowest discharge
opening
WARNING
Fire Risk.
Explosion Risk.
Inspect external fl ue cap regularly.
• Ensure no debris blocks cap.
• Combustible materials blocking cap may
ignite.
• Restricted air fl ow affects burner operation.
20
HORIZONTAL
OVERHANG
VERTICAL
WALL
X
300 mm
ROOF PITCH
IS X/ 300 mm
H (Min.) M
Heat & Glo • SOHO-N-AU • 2197-900 Rev. C • 9/09
To attach the vertical termination cap, slide the inner col-
lar of the cap into the inner fl ue of the pipe section and
place the outer collar of the cap over the outer fl ue of the
pipe section.
Secure the cap by driving the three self-tapping screws
(supplied) through the pilot holes in the outer collar of the
cap into the outer fl ue of the pipe (see Figure 8.5).
(1 of 3)
CAULK
Figure 8.5
TERMINATION CAP
STORM COLLAR