Installing Roof Flashing And Vertical Termination Cap - Heat & Glo SL-550TR-E Owner's Manual

Fireplaces
Hide thumbs Also See for SL-550TR-E:
Table of Contents

Advertisement

F. Installing Roof Flashing and Vertical Ter-
mination Cap
To install roof fl ashing see Figure 8.18.
For installation of vertical termination cap see minimum
vent heights for various pitched roofs (see Figure 8.18) .
HORIZONTAL
OVERHANG
2 FT.
20 INCHES MIN.
VERTICAL
MIN.
WALL
LOWEST
DISCHARGE
OPENING
GAS DIRECT VENT
TERMINATION CAP
X
12
ROOF PITCH
IS X/ 12
H (MIN.) - MINIMUM HEIGHT FROM ROOF
TO LOWEST DISCHARGE OPENING
Roof Pitch
H (Min.) Ft.
Flat to 6/12....................................... 1.0*
Over 6/12 to 7/12 ........................... 1.25*
Over 7/12 to 8/12 ............................. 1.5*
Over 8/12 to 9/12 ............................. 2.0*
Over 9/12 to 10/12 ............................ 2.5
Over 10/12 to 11/12 ........................ 3.25
Over 11/12 to 12/12 .......................... 4.0
Over 12/12 to 14/12 .......................... 5.0
Over 14/12 to 16/12 .......................... 6.0
Over 16/12 to 18/12 .......................... 7.0
Over 18/12 to 20/12 .......................... 7.5
Over 20/12 to 21/12 .......................... 8.0
* 3 foot minimum in snow regions
Figure 8.16 Minimum Height from Roof to Lowest Discharge
Opening
WARNING
Fire Risk.
Explosion Risk.
Inspect external vent cap regularly.
• Ensure no debris blocks cap.
• Combustible materials blocking cap may
ignite.
• Restricted air fl ow affects burner operation.
Caulk the gap between the roof fl ashing and the outside
diameter of the pipe. Also caulk the perimeter of fl ashing
that contacts roof surface as shown in Figure 8.18.
To attach the vertical termination cap, slide the inner col-
lar of the cap into the inner fl ue of the pipe section and
place the outer collar of the cap over the outer fl ue of the
pipe section.
Secure with three screws into the outer fl ue. Secure the cap
by driving the three self-tapping screws (supplied) through
the pilot holes in the outer collar of the cap into the outer
fl ue of the pipe (see Figure 8.17).
TERMINATION CAP
(1 of 3)
STORM
COLLAR
SCREWS
CAULK
Figure 8.17
CAULK
Figure 8.18
Page 37