Terminals 13 & 14 - Vacuum Switch - Heat & Glo FDN-5-PIER Installation And Operating Manual

Co-linear direct vent gas fireplaces, natural gas
Table of Contents

Advertisement

C.7 TERMINALS 13 & 14 - Vacuum Switch
TERMINALS 13 AND 14
VACUUM SWITCH
FACTORY WIRED
TERMINAL #13 CONNECTS TO THE
"COM" OR "NO" TERMINALS IN THE
VACUUM SWITCH FOR FIREPLACE 1.
TERMINAL #14 CONNECTS TO THE
"COM" OR "NO" TERMINALS IN THE
VACUUM SWITCH FOR FIREPLACE 1.
Figure 9C.7
Terminals 13 & 14
Heat & Glo • FDN-4-PIER, FDN-5-PIER, FDN-6-PIER, FDN-7-PIER Installation Manual • 16400-9803 • 2/19
32
9 - ELECTRICAL
FLUE VACUUM SWITCH
MOUNTED INTO FLUE STREAM

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Foundation pier seriesFdn-6-pierFdn-4-pierFdn-7-pier

Table of Contents