Ventilation; Overall Space Needed For The Boiler - Baxi POWER HT+ Series Installation, User And Service Manual

Hide thumbs Also See for POWER HT+ Series:
Table of Contents

Advertisement

Fig.21
7702630 - v02 - 11082018
Caution
Install the thermodynamic water heater in a frost-free
environment.
Caution
Install the boiler on a solid, stable structure able to bear its weight.
Caution
Do not stock chloride or fluoride compounds close to the boiler.
They are particularly corrosive and may contaminate the
combustion air. Chloride and fluoride compounds are present in
aerosol sprays, paints, solvents, cleaning products, washing
products, detergents, glues, snow clearing salts.
Caution
Do not store, even temporarily, explosive or easily combustible
materials in the boiler room or near the boiler.
Caution
Use plugs for the intake of air and discharge of combustion gases
observing the prevailing regulations and directives.
Caution
Connect the condensate discharge to the waste water near the
boiler.
Caution
France: Abide by the regulatory provisions of the Order of 23 June
1978 and the ATG C 321.4
5.3.1

Ventilation

To allow the intake of combustion air, sufficient ventilation must be
provided in the boiler room, for which the cross section and position must
satisfy the regulations in force in the country in which the boiler is installed:
If the boiler is installed in closed premises, respect the minimum
dimensions given in the diagram below. Also allow for openings to obviate
the following hazards:
Accumulation of gas
Overheating of the premises
All countries except Great Britain: Minimum cross section of the
openings: S1 + S2 = 150 cm
Ventilation to be provided for the boilers
MW-3000011-04
5.3.2

Overall space needed for the boiler

To ensure adequate access to the appliance and facilitate maintenance,
allow sufficient space around the boiler, according to the information
provided.
5 Before installation
2
POWER HT +
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents