5 Before installation
Fig.43
8
Fig.44
40
POWER HT +
>200 kg
MW-2000771-2
(1)
10
MW-2000772-2
8. Slide the boiler onto the unloading rails.
POWER HT+ 1.200
POWER HT+ 1.250
Caution
Moving the boiler is a job for two people.
9. Close the boiler.
(1)
Adjustment range for the feet: 20 mm
10. Level the boiler using the adjustable feet.
212 kg
232 kg
7702630 - v02 - 11082018