Baxi POWER HT+ Series Installation, User And Service Manual page 59

Hide thumbs Also See for POWER HT+ Series:
Table of Contents

Advertisement

Fig.78
Maximum length of the connections
130 - 150 kW
L
L
5
6
Tab.22
Maximum length for configuration C
Configuration
Unit
mm
5
m
6
m
7
m
8
m
Fig.79
Maximum length of the connections
L1
9
Tab.23
Maximum length for configuration C
Configuration
Unit
mm
9
m
7702630 - v02 - 11082018
L
L
7
8
33
POWER HT+ 1.130
Ø 110
L < 8
L < 8
L < 6
L < 7
L2
53
POWER HT+ 1.130
Ø 110
(L1 + L2) max = 20
(L1 max) = 10
Configuration C
33
Important
Pipes subject to technical evaluation 14 08–1289.
200 - 250 kW
L
5
6
POWER HT+ 1.150
POWER HT+ 1.200
Ø 110
Ø 160
L < 8
L < 20
L < 8
L < 22
L < 6
L < 16
L < 7
L < 20
Configuration C
53
Important
Pipes subject to technical evaluation 14 08–1289.
POWER HT+ 1.150
POWER HT+ 1.200
Ø 110
Ø 160
(L1 + L2) max = 20
(L1 + L2) max = 42
(L1 max) = 10
L
L
7
8
POWER HT+ 1.250
Ø 160
L < 11
L < 12
L < 6
L < 9
POWER HT+ 1.250
Ø 160
(L1 + L2) max = 21
POWER HT +
7 Installation
L
59

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents