Fig.41
Fig.42
7
7
7702630 - v02 - 11082018
6
6
7
7
MW-2000770-2
6. Fit the 2 rails on the edge of the pallet.
Caution
Ensure there is sufficient space to move the boiler.
7. Remove the four screws attaching the boiler to the pallet.
5 Before installation
i
4x
MW-2000769-2
POWER HT +
39