dv stove horizontal vent kit

DV 2 ft. Stove Vent Kit (Part # 946-116) and DV 4 ft. Stove Vent Kit (946-
216) includes all the parts needed to install the RC500E Direct Vent unit with
minimum horizontal and vertical vent dimensions. For installations that require
longer vertical and/or horizontal vents use the Dura-Vent system as shown in
the "Dura-Vent Termination Kit" and "Dura-Vent Venting Components" sections.
Qty.
Description
1) 1
Rigid Pipe Section (Kit # 946-116: 2 ft. (1.2m) length,
Kit # 946-216: 4 ft. (1.2m) length, 6-1/2" (165mm)
inside diameter
2) 1
Flex Liner, compressed aluminium 2 ply liner, 4" (102mm)
inside diameter
3) 4
spring spacers
4) 1
90 deg. Elbow
5) 1
Adjustable pipe section 13-1/2" to 24" (343mm x 610mm), 2 pcs.
6) 1
Thimble Cover
7) 1
Wall Thimble (2 pcs.)
8) 1
Adapter
9) 1
AstroCap Termination Cap
10) 2
Trim Collars
11) 1
Tube of Mill-Pac, high temperature sealant
12) 12
Screws, #8 x 1/2" Self tapping, Stainless Steel
13) 14
Screws, #8 x 1/2" Self tapping, Black
14) 4
Screws #8 x 1-1/2" Drill Point, Black
15) 4
Screws #8 x 1-1/2" Drill Point, Stainless Steel
16) 8
Wood screws #8 x 1"
dv stove horizontal vent kit (#946-116 & #946-216) installation
Review the following sequence of instructions
which are typical of most installations. The se-
quence may vary depending on wall thickness.
See the "Exterior Vent Terminal Locations"
section for vent location and clearance
dimensions, and "Vent Restrictor Position"
section to set the Vent Restrictor to the
correct position.
1. Set the unit in its desired location. Check
to determine if wall studs will be in the way
of the venting system, adjust location until
all clearances are met and there are no
obstructions.
Flue pipe Clearances to Combustibles
Horizontal top = 3"
Horizontal sides = 2"
Horizontal bottom = 2"
Vertical = 2"
Passing through wall/floor/ceiling
when fire-stop is used = 1-1/2"
Note: Center line dimensions shown are specifically
when using these 2 vent kits only.
Centerline
Centerline
I
MPORTANT:
Do not locate termination hood where exces-
sive snow or ice buildup may occur. Be sure
to check vent termination area after snow
falls, and clear to prevent accidental block-
age of venting system. When using snow
blowers, make sure snow is not directed
towards vent termination area.
Thimble
Cover
Trim
Collar
4" ID Liner
Adjustable Pipe
Length 13-1/2" - 24",
2 pieces
Spacer
Spring
4 ft. Pipe Length
with Kit # 946-216
or 2 ft. Pipe Length with
Kit # 946-116
Adapter
Trim Collar
Note:
a) Liner sections should be con-
tinuous without any joints or seams.
b) This is an approved system,
therefore components in this sys-
tem must not be substituted for
any other manufacturer's products.
2. Assemble a trial fit to determine the
vertical centerline for the vent termination.
center
of hole
a) Cut a 9-1/2" x 9-1/2" (241mm x 241 mm)
square hole on both the interior and
b) Install wall thimbles on both interior and
center
of hole
exterior wall with 4 wood screws (#8 x
1") per thimble.
c) Attach the 2 piece adjustable pipe
section to the vent terminal and slide
into position from the exterior. The larg-
C L
er diameter end of the adjustable pipe
goes to the vent terminal.
d) Install the 90
able pipe to determine the vertical
centerline.
Note: if the centerline cannot be met,
the adjustable sections will have to
be cut.
e) Cut the 4 ft. section of rigid pipe to
length. Attach the 45
pipe, and ensure that the pipe length
when cut (with the 45
onto both the starter collar and the 90
elbow. Crimped section of rigid pipe
seats into the 90
uncrimped side of pipe.
installation
AstroCap
Termination Cap
(Part# 946-523/P)
Wall Thimble
(required for
combustible walls)
exterior
elbow onto the adjust
o
elbow to the rigid
o
elbow) will seat
o
elbow. Only cut the
o
RC500E |
o
35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents