DataCard CR500 Installation And Administrator's Manual page 31

Instant issuance system
Hide thumbs Also See for CR500:
Table of Contents

Advertisement

1.
Place the printer in the desired location on the work surface. Refer to
on
page 11
2.
Mark the bolt-down hole location and drill the hole:
a.
Mark the front-right corner of the printer on the work surface.
b.
Measure and mark the following points on the work surface:
Along the front of the printer, 9-7/16 inch (240 mm) from the front-right corner.

Along the right side of the printer, 3-5/16 inch (83 mm) from the front-right corner.

c.
Move the printer and use the marked points to locate the bolt hole position.
d.
Drill the bolt hole.
3.
Place the printer over the drilled hole, aligning the front-right corner with the marked
location from
CR500 Instant Issuance System Installation and Administrator's Guide
for clearance requirements.
step
2a.
"Ventilation Clearance"
Mark this corner on
the work surface.
Mark and drill the bolt-
down hole here.
3-5/16 in. (83 mm)
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents