Genie Z-30/20N Service Manual page 65

Hide thumbs Also See for Z-30/20N:
Table of Contents

Advertisement

June 2011
REV A
How to Remove the
Primary Boom
Bodily injury hazard. This
procedure requires specific repair
skills, lifting equipment and a
suitable workshop. Attempting this
procedure without these skills and
tools could result in death or
serious injury and significant
component damage. Dealer
service is strongly recommended.
Note: Perform this procedure with the boom in the
stowed position.
Note: When removing a hose assembly or fitting,
the O-ring on the fitting and/or hose end must be
replaced and then torqued to specification during
installation. Refer to Section 2, Hydraulic Hose and
Fitting Torque Specifications.
1 Remove the platform.
2 Remove the platform rotator. See 2-3, How to
Remove the Platform Rotator .
3 Remove the jib boom. See 3-1,
How to Remove the Jib Boom .
4 Models without rotating jib boom: Remove
the jib boom bellcrank. See 3-2, How to
Remove the Jib Boom Bellcrank .
Models with rotating jib boom: Remove the
jib boom rotator. See 3-3, How to Remove the
Jib Boom Rotator .
Part No. 139378
Z-30/20N • Z-30/20N RJ • Z-34/22 • Z-34/22N
Section 4 • Repair Procedures
PRIMARY BOOM COMPONENTS
5 Tag, disconnect and cap the slave cylinder
hydraulic hoses at the union. Plug the hoses
from the slave cylinder.
Bodily injury hazard. Spraying
hydraulic oil can penetrate and
burn skin. Loosen hydraulic
connections very slowly to allow
the oil pressure to dissipate
gradually. Do not allow oil to
squirt or spray.
6 Remove the upper cable track mounting
fasteners from the platform end of the boom.
7 Remove the cable track mounting fasteners,
then remove the cable track from the boom and
lay it flat on the ground.
Component damage hazard. The
cable track can be damaged if it is
twisted.
Component damage hazard.
Cables and hoses can be
damaged if they are kinked or
pinched.
8 Raise the secondary boom until the primary
boom lift cylinder rod-end pivot pin is accessible
above the mid-pivot weldment. Turn the
machine off.
9 Disconnect the battery packs from the machine.
10 Remove all the hose and cable clamps from the
underside of the primary boom and at the pivot
end of the primary boom.
4 - 15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z-30/20n rj' z-34/22nZ-34/22dc

Table of Contents