Checklist D Procedures; Check The Primary Boom Wear Pads - Genie Z-30/20N Service Manual

Hide thumbs Also See for Z-30/20N:
Table of Contents

Advertisement

June 2011
REV A
D-1
Check the Primary Boom
Wear Pads
Note: Genie specifications require that this
procedure be performed every 1000 hours or
annually, whichever comes first.
Maintaining the primary boom wear pads in good
condition is essential to safe machine operation.
Wear pads are placed on boom tube surfaces to
provide a low friction, replaceable wear pad
between moving parts. Improperly shimmed wear
pads or continued use of worn out wear pads may
result in component damage and unsafe operating
conditions.
1 Measure each wear pad. Replace the wear pad
once it reaches the minimum allowable
thickness. If the wear pad is still within
specifications, shim as necessary to obtain
minimum clearance with zero binding.
2 Extend and retract the primary boom through
the entire range of motion to check for tight
spots that could cause binding or scraping.
Note: Always maintain squareness between the
primary boom outer and inner tubes.
Part No. 139378

Checklist D Procedures

Z-30/20N • Z-30/20N RJ • Z-34/22 • Z-34/22N
Section 3 • Scheduled Maintenance Procedures
Models without rotating jib boom:
Primary boom wear
pad specifications
Top and side wear pads
(extension end of boom)
Bottom wear pads
(extension end of boom)
Bottom and side wear pads
(pivot end of boom)
Top wear pads
(pivot end of boom)
Models with rotating jib boom:
Primary boom wear
pad specifications
All wear pads
Minimum
5
/
inch
8
15.9 mm
5
/
inch
8
15.9 mm
5
/
inch
8
15.9 mm
3
/
inch
8
9.5 mm
Minimum
3
/
inch
8
9.5 mm
3 - 23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z-30/20n rj' z-34/22nZ-34/22dc

Table of Contents