Genie Z-30/20N Service Manual page 20

Hide thumbs Also See for Z-30/20N:
Table of Contents

Advertisement

Section 3 • Scheduled Maintenance Procedures
SCHEDULED MAINTENANCE PROCEDURES
Maintenance Symbols Legend
The following symbols have been used in this
manual to help communicate the intent of the
instructions. When one or more of the symbols
appear at the beginning of a maintenance
procedure, it conveys the meaning below.
Indicates that tools will be required to
perform this procedure.
Indicates that new parts will be required
to perform this procedure.
Indicates that a cold motor or pump will
be required to perform this procedure.
Indicates that dealer service will be
required to perform this procedure.
3 - 2
Z-30/20N • Z-30/20N RJ • Z-34/22 • Z-34/22N
Maintenance Schedule
There are five types of maintenance inspections
that must be performed according to a schedule—
daily, quarterly, six months, annual, and two year.
The Scheduled Maintenance Procedures Section
and the Maintenance Inspection Report have been
divided into five subsections—A, B, C, D and E.
Use the following chart to determine which
group(s) of procedures are required to perform a
scheduled inspection.
Inspection
Daily or every 8 hours
Quarterly or every 250 hours
Six months or every 500 hours
Annual or every 1000 hours
Two year or every 2000 hours
Maintenance Inspection Report
The maintenance inspection report contains
checklists for each type of scheduled inspection.
Make copies of the Maintenance Inspection Report
to use for each inspection. Maintain completed
forms for a minimum of 4 years or in compliance
with employer, jobsite and governmental regulations
and requirements.
June 2011
Checklist
A
A + B
A + B + C
A + B + C + D
A + B + C + D + E
Part No. 139378

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z-30/20n rj' z-34/22nZ-34/22dc

Table of Contents