Completing Heater Installation; Attaching Fascia Assembly - Rinnai RIB2312L Operation & Installation Manual

Sapphire gas log flame fire
Hide thumbs Also See for RIB2312L:
Table of Contents

Advertisement

COMPLETING HEATER INSTALLATION

ATTACHING FASCIA ASSEMBLY

Step 8. Attach the Fascia to the Heater Engine
Standard
Fascia
B
A
Locate and remove the two 8g - 10mm fascia assembly securing screws
tabs
on the heater engine body.
B
These screws have been pre-inserted by the manufacturer to ensure correct threading of the fascia
securing tabs.
NOTE
Carefully pick up fascia assembly, taking care not to tilt the standard model fascia on it's edge as the glass may
slide out from the stand off posts.
Position the top fold
D
assembly until it is flush at the edges.
Ensure you DO NOT place excessive tension on or pinch the communication cable
manoeuvring the fascia into position.
NOTE
Fit and tighten the two fascia retaining screws
the heater engine body.
The glass dress guard (standard model) and the mesh dress guard (classic model) fitted to this
appliance reduces the risk of fire and injury and no part of it should be permanently removed.
NOTE
For protection of young children or the infirm a secondary guard is required.
If the heater is not operating correctly refer to the "TROUBLE SHOOTING CHECKLIST" on page 17
before contacting Rinnai.
It is the responsibility of the installer to check that under normal operating conditions of the
WARNING
appliance, all flue gases are exhausted to the outside atmosphere and that there is no spillage of
combustion gases into the room. Please refer to current AS/NZS 5601.
During the initial burning in period of approximately 2 hours, some smoke and smell may be
experienced. During this period the heater should be operated on High and the space being
heated should be well ventilated. It may take up to 20 minutes of operation for the logs to achieve
their full flame pattern and glow.
Burner aerations are factory set and can not be adjusted. If you are unable to get the unit to
operate correctly refer to "TROUBLE SHOOTING CHECKLIST" on page 17 before contacting
Rinnai.
Rinnai
Rear View
of Fascias
for reference
over the fascia assembly mounting panel
A
D
A
Classic
Fascia
A
and gently push the lower edge of the fascia
E
through both the fascia
45
F
C
pre-positioned in the fascia mounting
and the fascia mounting tabs
F
SAPPHIRE RIB2312 OIM
E
when
C
on
B

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rib2312n

Table of Contents