Zero Clearance Installation - Rinnai RIB2312L Operation & Installation Manual

Sapphire gas log flame fire
Hide thumbs Also See for RIB2312L:
Table of Contents

Advertisement

ZERO CLEARANCE INSTALLATION

Read this manual thoroughly and gain a full understanding of the requirements before
undertaking installation.
IMPORTANT
Ensure gas supply to heater is turned off for the first stages of this instruction.
Step 1.
Prepare Site - p.30
Step 2.
Assemble Zero Clearance Box - p.30
Step 3.
Fitting Zero Clearance Box Into Cavity - p.31
Step 4.
Unpack The Heater Engine - p.31
Step 5.
Preparing Heater Engine - p.31
Step 6.
Positioning the Heater Engine - p.32
Step 1. Prepare Site
Ensure the intended enclosure meets the requirements of the dimensions as stipulated in
"ENCLOSURE REQUIREMENTS" on page 22 and that gas and electrical supplies have been
IMPORTANT
prepared in accordance with the dimensions stipulated in "GAS SUPPLY" on page 23 and
"ELECTRICAL SUPPLY" on page 24.
Ensure there are no wall studs, noggins, ceiling joists, wiring or other obstruction within the wall
and or ceiling cavity where the flue is proposed to penetrate.
Step 2. Assemble Zero Clearance Box
Carefully remove the contents from the carton and check to ensure you have all contents as listed in "BEFORE
YOU START" on page 4. If ANY damage is evident or parts are missing DO NOT assemble the zero clearance box
and contact your supplier for advice.
Flue guide rails and pop rivets supplied with Zero Clearance kit, part number R2340.
NOTE
I
B
A
B1
B2
I. Assemble the transition box halves
Attach the guide plate
Drill 2 x Ø 3.2mm holes in the pre pressed location dimples on the back of the transition box and fit the transition
box assembly
A
Fit the two plastic grommets
II. Attach the two side panels
III. Attach top panel
G
and secure with three screws (supplied).
Next secure the top panel
Attach base panel
Then secure the base panel
Ensure flue has been installed as per 'Flueing Installation Manual For Rinnai Flamefire Heaters'.
Rinnai
HEATER ENGINE INSTALLATION
II
C
D
D
and
B1
to the transition box assembly
A
to the back panel
B
C
into the gas and electrical access holes of back panel
D
to the back panel
&
E
F
to the back panel
aligning the flue outlet hole to the rear over the transition box outlet
C
to the side panels
G
to the back panel
H
C
to the side panels
H
Step 7.
Connect Electrical Supply - p.32
Step 8.
Prepare Gas Supply - p.32
Step 9.
Insert Heater Engine Into Fireplace - p.32
Step 10. Securing The Heater Engine - p.32
Step 11. Connect Gas, Go to page 37
E
C
, secure together with
B2
and secure with two pop-rivets (supplied).
B
and secure with the two screws (supplied).
and secure with six screws (suppled).
C
with four screws (supplied).
&
E
F
and secure with two screws (supplied).
with four screws (supplied).
&
E
F
30
III
F
E
H
4 x screws (supplied).
.
C
G
F
SAPPHIRE RIB2312 OIM

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rib2312n

Table of Contents