Commissioning - Mira Vision Dual Installation Manual

Hide thumbs Also See for Vision Dual:
Table of Contents

Advertisement

COMMISSIONING

Turn on electrical supply to digital mixer valve.
Make sure the end of the hose is
in either the bath, shower tray or
other water catchment area.
Note! The overhead mounting will
flow water when switched on
1
2
("
" or "
") depending on the
outlet plumbing configuration.
1
Press "
" button and reduce
temperature to full cold "CLd".
Press "
" to increase to full
flow. For Low Pressure (pumped)
version, let shower run in order
to prime the pump. For long pipe
runs, let the shower run to allow
the pump to prime until a steady
stream of water flows.
Caution! Risk of product damage.
Do not run Pumped Valve (low
pressure version) without a water
supply for longer than 15 minutes
during priming.
37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents