Ceiling Fed Deluge Head - Mira Vision Dual Installation Manual

Hide thumbs Also See for Vision Dual:
Table of Contents

Advertisement

Place first washer in end of hose,
then attach to pipe end. Do not fit
showerhead until after pipework has
been fully flushed through. Refer to
section "Commissioning".

Ceiling Fed Deluge Head

The Deluge Head should be fixed to the ceiling at a convenient height for all the
family. It should be positioned so that water sprays down over the centre of the
bath, or away from the opening of a shower cubicle.
The fitting of the Deluge Head into the ceiling will be easier with the aid of a
helper.
When you are working within the bath or shower tray area use a towel or blanket
to protect the surface from damage.
Decide on a suitable position for
the deluge head avoiding cables
and pipes hidden between joists or
rafters. Note! A timber noggin or
plywood plinth securely fixed to the
joist should be used to mount the
Deluge Head.
Drill a 29 mm hole through the
ceiling and the wooden support.
Ensure the two holes drilled
are directly in line or the ceiling
pipework will be at an angle.
Push the Brazed Pipe through the
Ceiling Mount Plate then push the
threaded end of the brazed pipe
down through the holes made in the
ceiling.
Drill holes
in line!
Threaded end
27
Timber noggin or
plywood plinth
Drill 29 mm
Hole
Ceiling Mount
Plate
Brazed
Pipe

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents