Mira Vision Dual Installation Manual page 20

Hide thumbs Also See for Vision Dual:
Table of Contents

Advertisement

Long inlet pipework (dead-legs) should be kept to a minimum to avoid
temperature fluctuations.
Supply pipework layout must be arranged to minimize the effect of other
outlet usage upon the dynamic pressures at the digital mixer valve inlets.
To eliminate pipe debris it is essential that supply pipes are thoroughly
flushed through before connection to the digital mixer valve.
Valve Installation Orientation
Inlets
Inlets
Outlets
Outlets
Mounting on a Vertical Surface
Mounting on a Horizontal Surface
The digital mixer valve (which contains the thermostatic mixing valve) may
only be orientated in the positions shown above when mounted on a vertical
or horizontal surface. Failure to do so will compromise the ability of the unit to
fail-safe and deliver constant blend.
If the power supply cable is damaged, it must be replaced by the
manufacturer or a service engineer.
Warning! Turn off the electrical and water supplies before proceeding with
the installation of the appliance. The electricity must be turned off at the
mains and the appropriate circuit fuse electrically isolated, if applicable.
20

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents