Genie Z-45/25 Bi-Energy Service Manual page 69

Hide thumbs Also See for Z-45/25 Bi-Energy:
Table of Contents

Advertisement

July 2004
REV A
6 Z-45/25J: Remove the external snap rings from
the barrel-end pivot pin. Do not remove the pin.
Z-45/25: Remove the pin retaining fastener
from the slave cylinder barrel-end pivot pin. Do
not remove the pin.
7 Support the slave cylinder with a lifting device.
8 Z-45/25J: Support the jib boom bell crank with a
suitable lifting device.
9 Use a soft metal drift to drive the rod-end pivot
pin out.
Crushing hazard. The jib boom
bell crank could fall when the
slave cylinder rod-end pivot pin is
removed if not properly supported.
Component damage hazard. The
slave cylinder rod may become
damaged if it is allowed to fall if
not properly supported by the
lifting device.
10 Use a soft metal drift to remove the rod-end
pivot pin.
11 Use a soft metal drift to remove the barrel-end
pivot pin.
12 Carefully pull the cylinder out of the primary
boom.
Part No. 106488
Genie Z-45/25 Bi-Energy and Genie Z-45/25J Bi-Energy
Section 4 • Repair Procedures
PLATFORM COMPONENTS
How to Bleed the Slave Cylinder
1 Raise the primary boom to a horizontal position.
2 Move the platform level switch up and down
through two platform leveling cycles to remove
any air that might be in the system.
4 - 5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z45/25j

Table of Contents