Genie Z-45/25 Bi-Energy Service Manual page 64

Hide thumbs Also See for Z-45/25 Bi-Energy:
Table of Contents

Advertisement

Section 3 • Scheduled Maintenance Procedures
CHECKLIST E PROCEDURES
15 Place the large inner bearing into the rear of the
hub.
16 Install a new bearing grease seal into the hub
by pressing it evenly into the hub until it is flush.
Always replace the bearing grease
seal when removing the hub.
17 Slide the hub onto the yoke spindle.
Component damage hazard. Do
not apply excessive force or
damage to the lip of the seal may
occur.
18 Place the outer bearing into the hub.
19 Install the washer and castle nut.
20 Tighten the castle nut to 35 ft-lbs / 47 Nm to
seat the bearings.
21 Loosen the castle nut and re-tighten to
8 ft-lbs / 11 Nm.
22 Install a new cotter pin. Bend the cotter pin
to lock it in.
23 Install the dust cap, then the tire and wheel
assembly. Torque the wheel lug nuts to
specification. Refer to Section 2, Specifications.
3 - 40
Genie Z-45/25 Bi-Energy and Genie Z-45/25J Bi-Energy
July 2004
REV A
Part No. 106488

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z45/25j

Table of Contents