Genie Z-45/25 Bi-Energy Service Manual page 30

Hide thumbs Also See for Z-45/25 Bi-Energy:
Table of Contents

Advertisement

Section 3 • Scheduled Maintenance Procedures
MAINTENANCE INSPECTION REPORT
Model
Serial number
Date
Hour meter
Machine owner
Inspected by (print)
Inspector signature
Inspector title
Inspector company
Instructions
· Make copies of this page to use for
each inspection.
· Select the appropriate checklist(s) for
the type of inspection to be
performed.
Daily or 8 hour
Inspection:
Quarterly or 250 hour
Inspection:
Six Month or 500 hour
Inspection:
Annual or 1000 hours
Inspection:
2 Year or 2000 hour
Inspection:
A+B+C+D+E
· Place a check in the appropriate box
after each inspection procedure is
completed.
· If any inspection receives an "N", tag
and remove the machine from service,
repair and re-inspect it. After repair,
place a check in the "R" box.
Legend
Y = yes, acceptable
N = no, remove from service
R = repaired
Comments
3 - 6
Checklist C - Rev A
C-1 Perform engine
maintenance
C-2 Grease platform
overload (if equipped)
C-3 Test platform
overload (if equipped)
Perform every 800 hours:
C-4 Perform engine
maintenance
Checklist D - Rev A
D-1 Boom wear pads
D-2 Turntable bearing bolts
D-3 Free-wheel
configuration
D-4 Drive hub oil
D-5 Calibrate platform
overload system
(if equipped)
Perform every 1000 hours:
D-6 Perform engine
maintenance
A
Perform every 1500 hours:
D-7 Perform engine
A+B
maintenance
A+B+C
Checklist E - Rev A
E-1 Hydraulic oil
A+B+C+D
E-2 Perform engine
maintenance
E-3 Wheel bearings
Genie Z-45/25 Bi-Energy and Genie Z-45/25J Bi-Energy
Y N R
Y N R
Y N R
July 2004
Part No. 106488

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z45/25j

Table of Contents