APRILIA DORSODURO FACTORY ABS 2011 Service Station Manual page 292

Table of Contents

Advertisement

Manuals by Motomatrix / www.motomatrix.co.uk / The Solution For Lost Motorcycle Coded Keys.
Suspensions
Get the suitable tool for the tightening of the ring
nut. Carry out the following operations:
- carry out a first tightening of the ring nut to the
indicated tightening torque for the settlement of the
steering package.
- turn the steering completely from both sides, for
several times.
Loosen the ring nut completely.
- carry out the final tightening of the ring nut to the
indicated tightening torque.
Specific tooling
020884Y 46 mm wrench for steering ring nut
pos.
Description
1
Headstock ring nut - pre-tightening
1
Headstock ring nut - tightening
Fit the entire fork upper plate, adjusting
with short taps with a rubber hammer.
Scatter the nut thread with the specific
product and pre-fit it to the indicated
tightening torque.
Recommended products
LOCTITE® 243 Loctite adhesive to assemble
cylindrical pieces
Loctite adhesive to assemble cylindrical pieces
Tighten the fixing screws of the upper
plate to the prescribed tightening tor-
que.
SUSP - 292
email: info@motomatrix.co.uk
DORSODURO FACTORY ABS
S
TEERING RING NUT
Type
Quantity
M25x1
1
30 Nm (22.13 lbf ft)
M25x1
1
Torque
Notes
Steering package
settlement
12 Nm (8.85 lbf ft)
-

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents