Assembly - Grizzly G0827 Owner's Manual

Horizontal/vertical mill w/dro
Table of Contents

Advertisement

Assembly

The machine must be fully assembled before it
can be operated. Before beginning the assembly
process, refer to Needed for Setup and gather
all listed items. To ensure the assembly process
goes smoothly, first clean any parts that are cov-
ered or coated in heavy-duty rust preventative (if
applicable).
Your machine comes from the factory mostly
assembled. To complete assembly you must
install:
X-Axis handwheel handle
Y-Axis handwheel handle
Z-Axis crank
Coarse downfeed handles
Fine downfeed handwheel handle
To assemble mill:
1.
Install handwheel handles onto X-axis and
Y-axis handwheels (see Figure 19).
X-Axis
Handwheel
Y-Axis
Handwheel
Figure 19. Locations of X-axis and Y-axis
handwheels.
Model G0827 (Mfd. Since 11/17)
2.
Slide
Z-axis
crank
(see Figure 20).
Figure 20. Location of square spindle.
3.
Thread coarse downfeed handles into coarse
downfeed hub (see Figure 21).
4.
Remove fine downfeed handle from rear of
fine downfeed handwheel and thread into
front of handwheel (see Figure 21).
Fine
Downfeed
Handwheel
Handle
Coarse
Downfeed Handle
Figure 21. Downfeed components assembled.
onto
square
end
Square
End
-23-

Advertisement

Table of Contents
loading

Table of Contents