Set The Reference - Fluke Versiv User Manual

Cabling certification product family
Hide thumbs Also See for Versiv:
Table of Contents

Advertisement

Make sure that you select the correct cable type for the job,
and that the NVP for the cable is correct. See Table 2 on
page 39.
Make sure you select the correct test limit for the job. See
Table 2 on page 39.
Make sure the cords and connectors for all test equipment
and patch cords are in good condition.
Make sure the battery is fully charged.
Send the modules to a Fluke Networks service center every 12
months for factory calibration.

Set the Reference

The reference procedure for twisted pair cable sets the baseline
for insertion loss, ACR-F, and DC resistance measurements.
Set the reference at these times:
When you want to use the tester with a different module. The
tester can save reference values for eight different pairs of
modules.
When you attach Class F/F
optional DSX-PLA011 TERA
Every 30 days, at minimum. To ensure maximum accuracy of
test results, set the reference daily.
It is not necessary to set the reference when you change the link
interface adapters.
To set the reference
Turn on the tester and the remote a minimum of 1 minute
1
before you set the reference.
Set the reference only after the testers are at an
ambient temperature between 50 °F and 104 °F
(10 °C and 40 °C).
Chapter 2: Certify Twisted Pair Cabling
link interface adapters, such as the
A
adapters.
Note
Set the Reference
37

Advertisement

Table of Contents
loading

Table of Contents