d.
Check orientation of the ends and number of carriage cable windings
Reconfigure as required.
Spring/Hook end:
- 2.5 windings
- Fed from Capstan Bottom
- Oriented toward center of IIT
Figure 7 Carriage Cable Orientation
Initial issue
DC 3535/2240/1632
(Figure
7).
2.
Ball end:
- 2.5 windings
- Fed from Capstan top
- Oriented toward outside of IIT
02/03
4-47
Install Carriage Cable (ball end)
(Figure
1
Route the cable to the
small pulley and feed
it bottom-to-top
2
Route the cable to the
large pulley on the Half
Rate Carriage and
feed it top-to-bottom
Figure 8 Installing Carriage Cable (ball end)
8).
3
Insert the ball
into the retainer
Repairs and Adjustments
REP 6.11