Installation/Connection
This section explains how to install the instrument, connect
AC power and turn the power ON ( | )/OFF( ), and input
the vertical synchronizing signal.
About Installation
Provides operating environmental conditions for the instrument and notes
on installation.
About Connection
Explains how to connect measuring probes and connect the power cord.
(It also explains installation method of the optional 4-Probe Expansion Board.)
* Before turning on the power : Refer to pages 85 to 88 if you are going to communicate the instrument with the
Turning the Power ON ( | )/OFF( )
Explains how to turn ON ( | )/OFF( ) the power.
PC via RS-232C or USB.
23
Page 25
Page 26
Page 29