Change To Hart 5 / Hart 7; February - Fisher FIELDVUE DVC6200 Instruction Manual

Digital valve controller
Hide thumbs Also See for FIELDVUE DVC6200:
Table of Contents

Advertisement

Configuration

February 2017

Change to HART 5 / Change to HART 7
Field Communicator
Service Tool > Maintenance > Change to HART 5 / Change to HART 7 (3-5-3) HC or (3-5-4) AD, PD or (3-5-5) ODV
Note
This procedure must never be done while the valve is in service and controlling the process. Depending on the control system or
asset management system attached, complete system reset may be required to reestablish HART communication. Consult the
system documentation for further information.
This procedure changes the instrument from HART Universal Revision 5 to HART Universal Revision 7 (or vice versa).
Before proceeding, verify that your systems are prepared to support HART Universal Revision 7 devices. Follow the
prompts on the Field Communicator display.
36
Instruction Manual
D103605X012

Advertisement

Table of Contents
loading

Table of Contents