Section 3-Checklist And Cylinder Inspection; Compressor Operation Checklist; Cylinder Prefill Inspection; Hydrostatic Testing Date - Invacare HomeFill II Service Manual

Hide thumbs Also See for HomeFill II:
Table of Contents

Advertisement

SECTION 3—CHECKLIST AND CYLINDER INSPECTION
SECTION 3—CHECKLIST AND CYLINDER
INSPECTION

Compressor Operation Checklist

Each time the HomeFill II Compressor is used to fill a cylinder, complete the following
checklist:
Ensure the concentrator has been on for at least 30 minutes.
Perform the prefill inspection on the cylinder.
Connect the cylinder to the compressor.
Turn the compressor On.
Examine the indicator lights on the control panel.
Disconnect and remove the full cylinder.
Turn the compressor Off.
If filling another cylinder, repeat this checklist.

Cylinder Prefill Inspection

Use only cylinders that have the Invacare HomeFill II connection and the label,
FIGURE 3.1 on page 15.
All cylinders MUST be inspected before attempting to fill. Otherwise, injury or
damage may occur.
NOTE: For this procedure, refer to FIGURE 3.1 on page 15.

Hydrostatic Testing Date

Aluminum cylinders MUST undergo testing every five years.
DO NOT fill cylinders that have not been tested in the past five years. Otherwise,
serious personal injury may result. Contact your dealer for replacement.
HomeFill™II Compressor
WARNING
CAUTION
WARNING
14
Part No 1141487

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents