Ending An Active Test - Paradyne Hotwire 7975 User Manual

Paradyne m/sdsl standalone termination unit user's guide
Hide thumbs Also See for Hotwire 7975:
Table of Contents

Advertisement

Testing

Ending an Active Test

5-12
Except for the Remote Send Line Loopback and Remote DCLB, a test initiated by
the user can be ended by the user. Tests can also be terminated automatically by
enabling the Test Timeout option from the System Options Menu.
H
A Test Timeout option is available to automatically terminate a user-initiated
Loopback or Pattern test (as opposed to manually terminating a test) after it
has been running a specified period of time. The default is 10 minutes.
Refer to Table A-3,
System
Test Timeout does not pertain to tests initiated by the network.
H
On each test screen is a Command column. To stop the test, Press Enter
when the cursor is on the Stop command.
H
Use the Abort All Tests selection from the Test menu to stop all tests running
on all interfaces, with the exception of network-initiated loopbacks. Command
Complete appears when all tests on all interfaces have been terminated.
An aborted test may continue to run for a few seconds as the abort command
is sent to the remote end and processed.
December 1998
Options.
7975-A2-GB20-40

Advertisement

Table of Contents
loading

Table of Contents